CAPABILITIES 

Project Schemes and Life-Cycles Phase experience:

We have significant experience with all Project schemes identified below, from feasibility through to construction, commission, handover and close-out.

  • RIBA Stages 0 - 7
  • Network Rail GRIP Stages 1 to 8

European Directive and national guidance Proficiency with:

  • EMC Directive 2014/30/EU
  • Physical Agents Directive 2013/35/EU
  • UK EMC Regulations 2006
  • Power Quality G5/4 & G5/5



 

Standards covered, but not limited to:

  • EN 50121-x series.
  • EN 55103-x series
  • EN 61000-6-x series
  • EN 61000-4-x series
  • EN 61000-3-x series
  • EN 50122-1
  • EN 50130-4
  • ICNIRP Guidelines
  • EN 55015
  • EN 61547
  • EN 61439-x series
  • EN 62040-x
  • EN 62305-x
  • EN 12109
  • EN 61800-x series
  • DD ENV 50204
  • EN 55014
  • EN 55022
  • EN55024
  • London Underground EMC Standard 1-222 and G-222
  • Network Rail EMC Strategy NR/L1/SIG/30040
  • Network Rail EMC Process NR/L1/SIG/30041
  • London Underground Signalling Compatibility standards and processes
  • Network Rail Signalling Compatibility standards and processes

Our Capabilities, but not limited to:

  • Writing and reviewing EMC Strategy Plans.
  • Writing and reviewing EMC Control Plans.
  • Writing and reviewing EMC Test Specifications.
  • Writing and reviewing EMC Test Reports
  • Reviewing Declaration of Conformity Certifications
  • Managing Measurement Surveys - Radio Frequency and Electromagnetic Fields - pre and post construction.
  • Apparatus and System Compliance reviews and analysis.
  • EMC Technical Assessments and Technical Arguments.
  • EMC Risk Assessments and Hazard analysis.
  • Power Frequency (50Hz) Measurements and Assessments (G5/4)
  • Hazard Logs.
  • EMC/EMI Mitigation Techniques - apparatus through to system design.
  • Assurance evidence reviews and analysis.
  • Compliance Submissions and NR Form A-C submissions.
  • Witness testing.
  • Compliance with the EMF at Work Regulations 2016.
  • Modelling of Electromagnetic Fields to determine field strength versus distance.
  • Induced Voltage Studies - lineside cables 
Assets covered, but not limited to, include:

  • Rolling Stock - Diesel, EMU and Electro-diesel.
  • Signalling - relay, solid state and ERTMS Level 2
  • Train Detection
  • Control & Information
  • Lifts & Escalators
  • Radio Communication Systems
  • Telecommunication Systems
  • Building Services - electrical, mechanical and public health
  • LVAC and DC
  • Traction Power - OHLE and third and forth rail systems
  • Depots & Stabling
  • Fire Detection and Suppression Systems
  • Satellite broadcasting systems.
  • Audio console and video production systems